| After excavation, before pouring concrete |
Footer Inspection |
| Crawl Space - after block is laid. |
Foundation Inspection |
| Basement after forms are placed, before pouring concrete |
Basement Walls |
| Prior to pouring basement floor or slab |
Underfloor Plumbing |
| Before enclosing walls with wall boards, etc. |
Framing |
| Before enclosing walls with wall boards, etc. |
Rough-in Electrical |
| Before enclosing walls with wall boards, etc. |
Rough-in Plumbing |
| Before enclosing walls with wall boards, etc. |
Rough-in Heating A/C |
| Prior to utility hook-up |
Electrical Service Entrance |
| Prior to occupancy of structure |
Final Inspection |